Two modes. One rule: someone is accountable.

Projects with initiatives and tasks. Products with backlogs and stories. That is the whole method.

MiViPlan is three decades of running projects, minus the busy-work. No project plan to maintain, no spreadsheet to reconcile, no pizza tracker, no status theatre. A piece of work has a name, a person who is accountable for it, a start, a due date and an estimate — and a conversation attached to it. Common-sense accountability is what delivers, so that is what the software is built around.

No plan to feed Auto-schedules the work Both modes, one account 10 guests per seat

60 days

Everything, no card. Every new account starts here.

  • Unlimited projects, initiatives, tasks
  • Unlimited products, backlogs, stories
  • Working calendars & auto-schedule
  • Invite your whole team in EAFX

What we took out, on purpose

Most project software spends your team’s attention on the software. MiViPlan is deliberately opinionated about what does not earn its keep.

×

Busy-work this replaces

  • Project plans. A plan you have to re-cut every week is a report, not a plan.
  • Spreadsheets. Nobody has ever found the truth in row 314.
  • Pizza trackers, RAG walls, status meetings. The work is either done, or someone is on hook for it.
  • Custom fields, workflow designers, templates. Configuration is how a tool stops being usable.
  • Timesheets. MiViPlan plans effort; it does not police hours.
✓

The five things it keeps

  • A name. Task or story, in one sentence.
  • A person. One accountable name on every row — owner, collaborator or guest.
  • Time. Start, due date, and an effort estimate in minutes, hours, days, weeks, months or years.
  • A status. Weighted, yours to rename, with exactly one status that means finished.
  • A conversation. A board on every project, product, initiative, backlog, task and story — with the files attached.

Two modes, because work comes in two shapes

Delivering something once, and building something that keeps going. Pick the mode that matches the work; both live in the same account, side by side, with the same people and the same calendar.

Projects — deliver it once
PROJECT · Clinic relocation
INITIATIVE · Permits & inspections
TODOFile the change-of-use permitPriya
DECISIONSign the fit-out contractMarc
RISKPlan-check could move the openingDana
INITIATIVE · Fit-out
ACTIONBook the electricianMarc
ISSUEServer room has no cooling loopDana
Task types: TODO · ACTION · DECISION · RISK · ISSUE
Products — keep building it
PRODUCT · Field app
BACKLOG · Release 3.2
NEW-FEATUREOffline syncSam
DEFECTCrash on photo uploadIris
RESEARCHCan we sign on the device?Sam
BACKLOG · Discovery
EXPERIMENTTrial barcode check-inIris
ENHANCEMENTRemember the last siteSam
Story types: DEFECT · ENHANCEMENT · NEW-FEATURE · RESEARCH · EXPERIMENT

Project › Initiative › Task. Product › Backlog › Story. Nine levels of naming, and not one of them is a folder, an epic, a sub-epic or a custom workflow.

The home page is the whole product

Every project and product you can see, on one list, with the counts that matter and an inspector that plays the conversation. Nothing to configure before you can start.

app.miviplan.com/
MiViPlan Northwind Studio — owner
Projects
new project… + project
Clinic relocation 2 init · 9/14 tasks 1 late open
Website rebuild 3 init · 6/11 tasks open
Products
new product… + product
Field app 2 backlog · 12/31 stories 3 late open
Home: kitchen renovation 3 init · 4/9 tasks open
Inspector
project Website rebuild
Manager Marc Reyes

New marketing site, launch before the relocation open house.

Priya Nair (priya) — Friday, November 20, 2026 09:14 Copy freeze is Thursday. Marc Reyes (marc) — you have the last two pages.
Marc Reyes (marc) — Friday, November 20, 2026 09:31 Pricing and Careers are done. Starting Contact after standup.
Dana Whitfield (dana) — Friday, November 20, 2026 11:02 sitemap-audit.pdf · 84 KB · download
Message this project… Send

Swipe the screenshot sideways to see all of it.

The Home list is the account’s whole set, not a page of it — a project you cannot find is a project nobody uses. The last-activity feed names the whole chain each message sits on (project › initiative › task), and the chain is the link.

The green block is the useful part

Name the person accountable, give the work an estimate and a window, and MiViPlan answers the only question a plan has to answer: can this person actually deliver that? Green means yes. Red says what it clashes with and by how much. Auto-schedule moves it to the next window on their calendar with room for it.

app.miviplan.com/project/12/initiative/7
MiViPlan Northwind Studio — owner
Clinic relocation
› Permits & inspections 5 tasks board
File the change-of-use permit priya2026-12-04
Sign the fit-out contract marc2026-12-02
Plan check could move the opening danaoverdue
Book the surveyor marc2026-11-18 1d early
› Fit-out 6 tasks board
Sign the fit-out contract
project Clinic relocation › initiative Permits & inspections
StatusASSIGNED
TypeDECISION
AccountableMarc Reyes (marc)
Start2026-11-30
Due2026-12-02
Effort2
Unitdays
• scheduled

2 days of effort fits inside Marc’s working days between those dates: 960 of his 1,440 minutes there are free.

Auto-scheduleSaveArchive

Swipe the screenshot sideways to see all of it.

One row, one name, one date range, one estimate — and a verdict computed against a real calendar, not a wish. Colour is never the only signal: the chip reads scheduled or scheduling conflict, and the sentence beside it says why.

It schedules against the calendar people actually live by

Effort is converted to dates on a working calendar: hours per day, whether weekends count, and dated exceptions — holidays that are off, and Saturdays someone has chosen to work.

  • Three levels, one precedence. The tenant sets a default; a project or product can override it; a person’s own calendar — a holiday week, a chosen Saturday — overrides everything.
  • 2 days starting tomorrow, day after tomorrow non-working? The due date lands on the day after that day. The scheduler never parks work on a day nobody works.
  • Partial days count. 3 hours of work on a half-free afternoon is a real plan, so auto-schedule takes the half-day rather than the whole next week.
  • Lateness is measured on the same calendar. Due Friday, finished the following Monday is 1 working day late, not 3.
Effort 2 · days · starts 2026-11-30 Mon 30 working 480 min START Tue 1 exception: holiday 0 min Wed 2 working 480 min DUE The naive answer start + 2 calendar days = due Tue, on a day nobody works Whose calendar wins 1. the person their own exceptions 2. the container project or product 3. the tenant the default for all

Swipe the diagram sideways to read it at full size.

My Plan: what am I on hook for?

One button in the top bar, and every task and story you are accountable for appears in one list — grouped by the project or product it sits in, across every container you belong to. Answering that question should not mean opening every project in turn.

app.miviplan.com/myplan
MiViPlan Northwind Studio — collaborator
My Plan — Marc Reyes
Clinic relocation · project 4 open
Sign the fit-out contract 2026-12-02 IN-PROGRESS
Book the electrician 2026-12-08 2d late
Book the surveyor 2026-11-18 on time
Field app · product 3 open
Offline sync 2026-12-19 PLANNING
Remember the last site 2027-01-09 ON-HOLD
3 more items are assigned to you in a container whose access list does not name you. They are counted, not hidden — ask an owner of that work to add you.

Swipe the screenshot sideways to see all of it.

Being accountable for something is not the same as being allowed inside it, and a plan that quietly omitted half a person’s obligations would be worse than one that admits the gap.

Finished work tells the truth afterwards

When a row reaches 100 % complete, MiViPlan stamps the actual finish against the estimate as it stood at that moment — so a due date edited afterwards cannot turn a three-day slip into an on-time finish.

  • Reopen and it clears. Move the item below 100 % and the stamp goes; complete it again and it re-stamps.
  • Nothing invented. A finished row with no tracked date says not tracked rather than implying it was on time.
  • Estimates are yours. You may correct a finish date; you may never edit the snapshot of what you promised.
RowBadge the app showsMeaning
Book the surveyor1d earlyFinished one working day before the estimate it carried.
Sign the contracton timeFinished on the estimated day.
Book the electrician2d lateTwo working days late, counted on the accountable person’s calendar.
Old story, pre-V4not trackedCompleted before tracking existed. No date was guessed.

Swipe the table sideways to see all of it.

Every level has a board, and the board is where the work actually happens

Six places talk: project, product, initiative, backlog, task and story. iMessage-style bubbles, newest at the bottom, each person in their own pastel tint, so a long thread reads at a glance. Anyone can speak on any board they can see — including guests. Only owners and collaborators change a status or a note.

app.miviplan.com/project/12/task/418
project Clinic relocation › initiative Permits & inspections › task File the change-of-use permit
moderate □
Priya Nair (priya) — Tuesday, November 24, 2026 14:32 Counter signed the form. Filing tomorrow morning. Marc Reyes (marc) — plan check is yours to chase.
Dana Whitfield (dana) — Tuesday, November 24, 2026 14:47 permit-application-v3.pdf · 1.2 MB · download
Marc Reyes (marc) — Tuesday, November 24, 2026 15:05 permit-application-v3.pdf · 1.4 MB · download superseding v3 — confirm?
@ Send attach

Swipe the screenshot sideways to see all of it.

Type @ and pick a person: the server decides who was named and records it, so the badge on the bubble and the record behind it are one fact and never two parses that disagree.

V

Files are versioned, not duplicated

A file belongs to its container — the project or product — and inside that container a name has exactly one current version.

  • Re-post the same bytes on another board and nothing is stored; the new bubble points at the file that already exists.
  • Same name, different bytes: the upload is refused until you confirm which file it supersedes. A swap is never silent.
  • Superseded versions stay downloadable, are numbered in the Attachments index, and an owner may destroy them as bookkeeping.
↺

Messages are never destroyed

Removal sets a flag. Everyone else sees the thread close up; a tenant owner in moderate mode sees what was removed, by whom and when — and can put it back.

  • An author may retract their own message only while it is the newest on that board.
  • Only a tenant owner may remove anyone else’s, and there is no permanent purge for messages at all.
  • Files soft-delete (struck through, not downloadable) and purge as two separate acts.
≡

The Attachments index

One table of every file in the account, newest first, filterable by container and by board, with the version families shown in front of you.

  • Who uploaded it, when, and which boards point at it.
  • Restore a withdrawn file, or destroy it for good — separate buttons, separate decisions.
  • 10 MB per upload by default, and that ceiling is a setting, not a constant.

One calendar, four questions

What does this week look like for Dana? What is still open on the Field app? When does the clinic project actually land? What is the whole team carrying? Same grid, four scopes.

  • Day, week, month or year — and the view you are on is a real address you can send to someone: /calendar/month/person/9.
  • Grey cells are the working calendar made visible, so a non-working day and a quiet day are not the same thing.
  • Scoped by person, by project, by product, or the whole tenant at once.
  • Chips are ellipsised, never cut off. The list under the grid carries the full title, and only that block scrolls — never the page.
app.miviplan.com/calendar/month/person/9
MonthWeekDayYear Dana WhitfieldPerson November 2026
Mon
Tue
Wed
Thu
Fri
Sat
Sun
23
Surveyor
24
Plan check
25
26
Vendor demo
27
Contract
28
29
30
Permit filing
1
2
Contract due
3
4
Permit due
5
6

Swipe the screenshot sideways to see all of it.

Grey is a non-working day on that person’s calendar. Tuesday 1 is a tenant holiday.

Your words, not ours — inherited by merge

Statuses, task types and story types arrive preseeded and stay yours. Every level starts with the list above it and may then add an entry, override one it inherited, or hide it. Nothing about a template has to be accepted wholesale.

NEW 10% TBD 20% PENDING 30% PLANNING 40% ASSIGNED 50% ON-HOLD 55% IN-PROGRESS 60% BLOCKED 65% AT-RISK 70% FAILED 75% COMPLETED 100% CANCELED 0% OUT-OF-SCOPE 0% UNKNOWN 0%

Fourteen seeded statuses, each with a completion weight and a colour you can change.

⊕

Add, override, hide, reset

Tenant owners customise at tenant level and again per project or product. Editing a value in the table writes the right one of those automatically: this level owns the row, so it is edited; otherwise an override is created here.

  • A hidden status disappears from every picker below — and cannot be un-hidden further down.
  • Hidden entries never vanish from history: a task labelled with one still shows that label.
  • Reset reverts a level to inheriting again — but is refused while work still points at that label.
✓

Exactly one status means “done”

COMPLETED is a system status: it cannot be hidden, renamed or re-weighted, and no other status may sit at 100 %.

  • “Is this finished?” must have one answer, or the lateness figure and the My Plan filter mean nothing.
  • Closed is not the same as complete: FAILED, CANCELED and OUT-OF-SCOPE close a row without crediting work that never happened.
  • Its colour and order are still yours to change.
⚙

Settings that fit on one screen

Account, working calendar, statuses, task types and story types are five tabs. Each project and product has its own five: general, who can see it, working calendar, statuses, and its own types.

  • Archive anything, and un-archive it — a mistake is not permanent.
  • Nothing needs an administrator, a ticket, or a consultant.
  • The platform seeds every new tenant with the same defaults, so your first project is never a blank page.

Who may see it, who may change it

Three roles come from your EAFX account. On top of them, every project and product keeps its own access list, so an owner decides per container who sees what — and a person in the wrong container is refused, not shown an empty shell.

  • Nothing crosses a tenant. One person may belong to several accounts and switch between them in the top bar; the work in each is entirely separate.
  • A guest is not a second-class participant. Guests speak on boards, upload files, and can be named accountable for a task — and they use no seat.
  • “Manager” is a label, never a permission. Every project, product, initiative and backlog names the person it is accountable to, and nothing in the access model reads it.
  • Read-only is enforced server-side, not just hidden in the interface: a lapsed subscription or a guest cannot reach a write route at all.

OWNER

Creates projects and products, sets access and calendars, moderates boards, deletes files. Holds a seat.

COLLABORATOR

Creates initiatives, backlogs, tasks and stories; changes status and notes; sets their own working calendar. Holds a seat.

GUEST

Talks on every board they can see, attaches files, and can be the person accountable for a task. Uses no seat.

Your first real plan, in about ten minutes

This is the whole adoption path. There is no implementation, no template gallery, no consultant.

Create your EAFX account

One identity covers MiViPlan, WHY Dash, ioBudget and sMarked. Your 60-day trial starts at registration and no card is asked for.

Add your people

Invite them in EAFX and give each a role. Seats are for people who change the plan; guests cost nothing and get 10 per seat.

Name the container

Type Clinic relocation next to new project… on the home page, or new product… for something you will keep building. That is a project made.

Split it once

Two or three initiatives — Permits & inspections, Fit-out. An initiative is a name and a description; do not overthink it.

Name the work

File the change-of-use permit. Pick the type, pick the person, give the effort and the unit. Status defaults to NEW.

Press Auto-schedule

The task lands in the next window that person can genuinely deliver in. Then press My Plan, and start working. The plan maintains itself from here.

●

For the office

One tenant, both modes: the relocation is a project with a finish; the field app is a product with a backlog that never really ends. Same people, same calendar, one My Plan across both.

  • Decisions, risks and issues live on the same list as the doing — as their own task types.
  • The board under each task is where the answer arrives, with the PDF attached to it.
○

And for home

A kitchen renovation is a project too. The same four minutes of setup gives you a due date your spouse can read and a calendar that knows you are away in December.

  • Give your partner owner access to one project and nobody else’s.
  • Personal calendar overrides work calendars: your holiday is a non-working day everywhere.

Pricing you can quote from memory

Every plan is the whole product — both modes, every calendar, every catalogue, unlimited everything. The only difference is how many people may change the plan.

START HERE

Trial

Everything, unfettered

$0 / 60 days
  • All features, no metering
  • No card required
  • Converts to a plan, or simply stops
Start the trial

Single

You, plus everyone you invite as a guest

$9.99 / month
  • One seat, unlimited projects and products
  • 10 guests — guests use no seat
  • $99.99/year if you prefer annual
Choose Single

Team

Per person who changes the plan

$19.99 / seat / month
  • Owners, collaborators and guests
  • 10 guests per seat
  • $199.99 per seat/year annually
  • One person can hold several accounts
Choose Team

Prices as of November 2026. Team totals are quoted at checkout and that quote is authoritative. Accounts, seats and billing live at id.eafx.net; MiViPlan never touches your payment details.

Straight answers to the questions people actually ask

How is this different from Jira, Asana, Monday or Planner?
Those tools are built around configuration: issue types, fields, boards, automations, workflow designers. MiViPlan is built around a premise — a piece of work has a name, one accountable person, an estimate and a date, and a conversation attached to it. You cannot add a field, and that is the point: the moment a team can configure its tracker, it stops using it. Two modes, three levels, done.
Why is there no Gantt chart, no RAG dashboard and no timesheets?
Because they are how teams spend time managing the work instead of doing it. A Gantt is a plan you have to re-cut every week; MiViPlan gets the same answer from a due date, an estimate and the accountable person’s calendar — and then auto-schedules it. If a schedule slips, the row says 2d late; you do not need a wall of red squares to tell you.
Project or product — which do I use?
If it has an end, it is a project: a relocation, an implementation, a move, a film. If it keeps being built, it is a product: an app, a service, a publication. Projects carry initiatives and tasks; products carry backlogs and stories. Most teams have both, and one account holds them side by side — the same people, the same working calendar, one My Plan across every container.
Can I really use it for personal work?
Yes, and it is the same four minutes. A renovation, a move, a thesis, a wedding is a project: initiatives, tasks, someone accountable, an effort estimate. Your personal calendar overrides every project calendar, so the week you are away stops being a working week everywhere at once.
Does it email me when I am assigned something?
Not yet, and we would rather say so than let you discover it. My Plan is the answer today — one press and everything you are accountable for is in front of you. Mentions are recorded and resolved properly, so notification is a feature waiting to be built on top of them, not a rewrite.
What happens when the trial ends?
The tenant goes read-only, not away. Every project, board and file is still visible, and nothing is deleted to punish you for not paying. Choose a plan in EAFX and writing comes back immediately.
Who can see my projects?
Only the people named on that project’s access list. Another tenant cannot reach your work by guessing an identifier — the application resolves the tenant that owns a thing before it asks what you are inside it, and answers You do not have access to this project rather than an empty shell. If you are made accountable for a task inside a container you cannot see, My Plan counts it and tells you to ask to be added, instead of quietly hiding half your obligations.
Where do the files live, and can they be recovered?
On our own file store, versioned per container, with the database and the file store backed up on separate hosts on a schedule — a dump whose files are missing reads as a successful restore, so both halves are mandatory. Withdrawal is soft and reversible; permanent destruction is a separate act, on a separate button.
Is there a mobile app?
There is a web app that fits the window it is given — phone, laptop or conference screen. Only the block that genuinely needs it scrolls, never the page. There is no native app to install and no updater to run.
Why do I sign in at id.eafx.net?
MiViPlan has no accounts of its own. Identity, invitations, seats, roles and billing are handled by EAFX Identity, the same sign-in you use for WHY Dash, ioBudget and sMarked — so there is no separate password here to forget, reset or breach.

Less time managing the work. More time on the work.

A mission, a vision and a plan is all a team needs. Name the task, name the person, give it an estimate — and let the calendar do the rest.

One EAFX identity · no card to start · guests use no seat · your work is never shared between tenants

The screens above are drawn in HTML and CSS from the current build of MiViPlan (November 2026). The layout, labels and controls are the product; the names, dates and numbers are fixture data.