Two modes. One rule: someone is accountable.
Projects with initiatives and tasks. Products with backlogs and stories. That is the whole method.
MiViPlan is three decades of running projects, minus the busy-work. No project plan to maintain, no spreadsheet to reconcile, no pizza tracker, no status theatre. A piece of work has a name, a person who is accountable for it, a start, a due date and an estimate — and a conversation attached to it. Common-sense accountability is what delivers, so that is what the software is built around.
60 days
Everything, no card. Every new account starts here.
- Unlimited projects, initiatives, tasks
- Unlimited products, backlogs, stories
- Working calendars & auto-schedule
- Invite your whole team in EAFX
What we took out, on purpose
Most project software spends your team’s attention on the software. MiViPlan is deliberately opinionated about what does not earn its keep.
Busy-work this replaces
- Project plans. A plan you have to re-cut every week is a report, not a plan.
- Spreadsheets. Nobody has ever found the truth in row 314.
- Pizza trackers, RAG walls, status meetings. The work is either done, or someone is on hook for it.
- Custom fields, workflow designers, templates. Configuration is how a tool stops being usable.
- Timesheets. MiViPlan plans effort; it does not police hours.
The five things it keeps
- A name. Task or story, in one sentence.
- A person. One accountable name on every row — owner, collaborator or guest.
- Time. Start, due date, and an effort estimate in minutes, hours, days, weeks, months or years.
- A status. Weighted, yours to rename, with exactly one status that means finished.
- A conversation. A board on every project, product, initiative, backlog, task and story — with the files attached.
Two modes, because work comes in two shapes
Delivering something once, and building something that keeps going. Pick the mode that matches the work; both live in the same account, side by side, with the same people and the same calendar.
Project › Initiative › Task. Product › Backlog › Story. Nine levels of naming, and not one of them is a folder, an epic, a sub-epic or a custom workflow.
The home page is the whole product
Every project and product you can see, on one list, with the counts that matter and an inspector that plays the conversation. Nothing to configure before you can start.
New marketing site, launch before the relocation open house.
Swipe the screenshot sideways to see all of it.
The Home list is the account’s whole set, not a page of it — a project you cannot find is a
project nobody uses. The last-activity feed names the whole chain each message sits on
(project › initiative › task), and the chain is the link.
The green block is the useful part
Name the person accountable, give the work an estimate and a window, and MiViPlan answers the only question a plan has to answer: can this person actually deliver that? Green means yes. Red says what it clashes with and by how much. Auto-schedule moves it to the next window on their calendar with room for it.
2 days of effort fits inside Marc’s working days between those dates: 960 of his 1,440 minutes there are free.
Swipe the screenshot sideways to see all of it.
One row, one name, one date range, one estimate — and a verdict computed against a real calendar, not a wish. Colour is never the only signal: the chip reads scheduled or scheduling conflict, and the sentence beside it says why.
It schedules against the calendar people actually live by
Effort is converted to dates on a working calendar: hours per day, whether weekends count, and dated exceptions — holidays that are off, and Saturdays someone has chosen to work.
- Three levels, one precedence. The tenant sets a default; a project or product can override it; a person’s own calendar — a holiday week, a chosen Saturday — overrides everything.
- 2 days starting tomorrow, day after tomorrow non-working? The due date lands on the day after that day. The scheduler never parks work on a day nobody works.
- Partial days count. 3 hours of work on a half-free afternoon is a real plan, so auto-schedule takes the half-day rather than the whole next week.
- Lateness is measured on the same calendar. Due Friday, finished the following Monday is 1 working day late, not 3.
Swipe the diagram sideways to read it at full size.
My Plan: what am I on hook for?
One button in the top bar, and every task and story you are accountable for appears in one list — grouped by the project or product it sits in, across every container you belong to. Answering that question should not mean opening every project in turn.
Swipe the screenshot sideways to see all of it.
Being accountable for something is not the same as being allowed inside it, and a plan that quietly omitted half a person’s obligations would be worse than one that admits the gap.
Finished work tells the truth afterwards
When a row reaches 100 % complete, MiViPlan stamps the actual finish against the estimate as it stood at that moment — so a due date edited afterwards cannot turn a three-day slip into an on-time finish.
- Reopen and it clears. Move the item below 100 % and the stamp goes; complete it again and it re-stamps.
- Nothing invented. A finished row with no tracked date says not tracked rather than implying it was on time.
- Estimates are yours. You may correct a finish date; you may never edit the snapshot of what you promised.
| Row | Badge the app shows | Meaning |
|---|---|---|
| Book the surveyor | 1d early | Finished one working day before the estimate it carried. |
| Sign the contract | on time | Finished on the estimated day. |
| Book the electrician | 2d late | Two working days late, counted on the accountable person’s calendar. |
| Old story, pre-V4 | not tracked | Completed before tracking existed. No date was guessed. |
Swipe the table sideways to see all of it.
Every level has a board, and the board is where the work actually happens
Six places talk: project, product, initiative, backlog, task and story. iMessage-style bubbles, newest at the bottom, each person in their own pastel tint, so a long thread reads at a glance. Anyone can speak on any board they can see — including guests. Only owners and collaborators change a status or a note.
Swipe the screenshot sideways to see all of it.
Type @ and pick a person: the server decides who was named and records it, so the
badge on the bubble and the record behind it are one fact and never two parses that disagree.
Files are versioned, not duplicated
A file belongs to its container — the project or product — and inside that container a name has exactly one current version.
- Re-post the same bytes on another board and nothing is stored; the new bubble points at the file that already exists.
- Same name, different bytes: the upload is refused until you confirm which file it supersedes. A swap is never silent.
- Superseded versions stay downloadable, are numbered in the Attachments index, and an owner may destroy them as bookkeeping.
Messages are never destroyed
Removal sets a flag. Everyone else sees the thread close up; a tenant owner in moderate mode sees what was removed, by whom and when — and can put it back.
- An author may retract their own message only while it is the newest on that board.
- Only a tenant owner may remove anyone else’s, and there is no permanent purge for messages at all.
- Files soft-delete (struck through, not downloadable) and purge as two separate acts.
The Attachments index
One table of every file in the account, newest first, filterable by container and by board, with the version families shown in front of you.
- Who uploaded it, when, and which boards point at it.
- Restore a withdrawn file, or destroy it for good — separate buttons, separate decisions.
- 10 MB per upload by default, and that ceiling is a setting, not a constant.
One calendar, four questions
What does this week look like for Dana? What is still open on the Field app? When does the clinic project actually land? What is the whole team carrying? Same grid, four scopes.
- Day, week, month or year — and the view you are on is a real address you can send
to someone:
/calendar/month/person/9. - Grey cells are the working calendar made visible, so a non-working day and a quiet day are not the same thing.
- Scoped by person, by project, by product, or the whole tenant at once.
- Chips are ellipsised, never cut off. The list under the grid carries the full title, and only that block scrolls — never the page.
Swipe the screenshot sideways to see all of it.
Grey is a non-working day on that person’s calendar. Tuesday 1 is a tenant holiday.
Your words, not ours — inherited by merge
Statuses, task types and story types arrive preseeded and stay yours. Every level starts with the list above it and may then add an entry, override one it inherited, or hide it. Nothing about a template has to be accepted wholesale.
Fourteen seeded statuses, each with a completion weight and a colour you can change.
Add, override, hide, reset
Tenant owners customise at tenant level and again per project or product. Editing a value in the table writes the right one of those automatically: this level owns the row, so it is edited; otherwise an override is created here.
- A hidden status disappears from every picker below — and cannot be un-hidden further down.
- Hidden entries never vanish from history: a task labelled with one still shows that label.
- Reset reverts a level to inheriting again — but is refused while work still points at that label.
Exactly one status means “done”
COMPLETED is a system status: it cannot be hidden, renamed or re-weighted, and no other status
may sit at 100 %.
- “Is this finished?” must have one answer, or the lateness figure and the My Plan filter mean nothing.
- Closed is not the same as complete: FAILED, CANCELED and OUT-OF-SCOPE close a row without crediting work that never happened.
- Its colour and order are still yours to change.
Settings that fit on one screen
Account, working calendar, statuses, task types and story types are five tabs. Each project and product has its own five: general, who can see it, working calendar, statuses, and its own types.
- Archive anything, and un-archive it — a mistake is not permanent.
- Nothing needs an administrator, a ticket, or a consultant.
- The platform seeds every new tenant with the same defaults, so your first project is never a blank page.
Who may see it, who may change it
Three roles come from your EAFX account. On top of them, every project and product keeps its own access list, so an owner decides per container who sees what — and a person in the wrong container is refused, not shown an empty shell.
- Nothing crosses a tenant. One person may belong to several accounts and switch between them in the top bar; the work in each is entirely separate.
- A guest is not a second-class participant. Guests speak on boards, upload files, and can be named accountable for a task — and they use no seat.
- “Manager” is a label, never a permission. Every project, product, initiative and backlog names the person it is accountable to, and nothing in the access model reads it.
- Read-only is enforced server-side, not just hidden in the interface: a lapsed subscription or a guest cannot reach a write route at all.
OWNER
Creates projects and products, sets access and calendars, moderates boards, deletes files. Holds a seat.
COLLABORATOR
Creates initiatives, backlogs, tasks and stories; changes status and notes; sets their own working calendar. Holds a seat.
GUEST
Talks on every board they can see, attaches files, and can be the person accountable for a task. Uses no seat.
Your first real plan, in about ten minutes
This is the whole adoption path. There is no implementation, no template gallery, no consultant.
Create your EAFX account
One identity covers MiViPlan, WHY Dash, ioBudget and sMarked. Your 60-day trial starts at registration and no card is asked for.
Add your people
Invite them in EAFX and give each a role. Seats are for people who change the plan; guests cost nothing and get 10 per seat.
Name the container
Type Clinic relocation next to new project… on the home page, or
new product… for something you will keep building. That is a project made.
Split it once
Two or three initiatives — Permits & inspections, Fit-out. An initiative is a name and a description; do not overthink it.
Name the work
File the change-of-use permit. Pick the type, pick the person, give the effort and the unit.
Status defaults to NEW.
Press Auto-schedule
The task lands in the next window that person can genuinely deliver in. Then press My Plan, and start working. The plan maintains itself from here.
For the office
One tenant, both modes: the relocation is a project with a finish; the field app is a product with a backlog that never really ends. Same people, same calendar, one My Plan across both.
- Decisions, risks and issues live on the same list as the doing — as their own task types.
- The board under each task is where the answer arrives, with the PDF attached to it.
And for home
A kitchen renovation is a project too. The same four minutes of setup gives you a due date your spouse can read and a calendar that knows you are away in December.
- Give your partner owner access to one project and nobody else’s.
- Personal calendar overrides work calendars: your holiday is a non-working day everywhere.
Pricing you can quote from memory
Every plan is the whole product — both modes, every calendar, every catalogue, unlimited everything. The only difference is how many people may change the plan.
Trial
Everything, unfettered
- All features, no metering
- No card required
- Converts to a plan, or simply stops
Single
You, plus everyone you invite as a guest
- One seat, unlimited projects and products
- 10 guests — guests use no seat
- $99.99/year if you prefer annual
Team
Per person who changes the plan
- Owners, collaborators and guests
- 10 guests per seat
- $199.99 per seat/year annually
- One person can hold several accounts
Prices as of November 2026. Team totals are quoted at checkout and that quote is authoritative. Accounts, seats and billing live at id.eafx.net; MiViPlan never touches your payment details.
Straight answers to the questions people actually ask
How is this different from Jira, Asana, Monday or Planner?
Why is there no Gantt chart, no RAG dashboard and no timesheets?
Project or product — which do I use?
Can I really use it for personal work?
Does it email me when I am assigned something?
What happens when the trial ends?
Who can see my projects?
Where do the files live, and can they be recovered?
Is there a mobile app?
Why do I sign in at id.eafx.net?
Less time managing the work. More time on the work.
A mission, a vision and a plan is all a team needs. Name the task, name the person, give it an estimate — and let the calendar do the rest.
One EAFX identity · no card to start · guests use no seat · your work is never shared between tenants
The screens above are drawn in HTML and CSS from the current build of MiViPlan (November 2026). The layout, labels and controls are the product; the names, dates and numbers are fixture data.